Construction
Create a searchable record of jobsite radio activity.
Records crane lift, delivery, and safety radio traffic.
Authorized jobsite radio activity in range.
Captured and indexed.
Jobsite Radio (UHF/VHF)
Configured rigger, crane, delivery, safety, and subcontractor radio channels captured for review.
Digital Radio (P25/DMR)
Unencrypted digital dispatch channels alongside analog UHF/VHF on the same node.
Drone Tracking (Remote ID)
Remote ID broadcasts captured when available over active crane and lift zones.
Safety & Incident Review
Configured safety announcements and incident-related radio activity can be captured for review.
AI Transcription & Logs
Searchable transcripts and review-ready exports for lift coordination and safety review.
Remote Deployment
Ruggedized Sentinel nodes mount to crane masts, site offices, or perimeter fences.
Why operators choose Towerless.
No new radios. No workflow change. The local record begins when power is connected.
No transmit.
No interference.
Towerless listens only. It does not transmit, control, or interfere with existing operations.
Works without
internet.
The record builds locally. Cloud sync and dashboards are strictly optional.

Reports when
you need them.
Export timelines for safety review, insurance support, management review, and operational reporting.

Built for the site
you have.
Indoor, outdoor, self-install,
assisted deployment, or secure
government workflow.
When a site incident occurs, the sequence of radio commands can be difficult to reconstruct from witness statements alone.
Towerless passively captures configured authorized unencrypted site radio activity and turns it into a searchable timeline for safety and incident review.

Site activity documented.
No radios replaced.
No work slowed.
Construction sites depend on radio for crane lifts, deliveries, gate access, safety calls, and contractor coordination. Important coordination often happens quickly and is not always preserved.
When something goes wrong, the record is usually incomplete.
Towerless sits beside the jobsite operation and creates a timestamped, searchable supplementary record of configured authorized unencrypted site radio activity. It does not transmit, interfere, or require changes to existing radios.
Built to sit beside the operation.
- Listen only.
- Process locally.
- Link context where supported.
- Export the record.
- No workflow change.
Designed to build a local supplementary record without transmitting, interfering, or changing the workflow.
System Capabilities
Mission Areas
Four layers. One dashboard.
Voice transcription, position logging, and operational context — searchable locally and exportable when needed.

.png)
CRANE ACTIVITY REVIEW
When a lift or site activity requires review, access timestamped transcripts of configured radio activity around the review window.
.png)
CONTRACTOR COORDINATION
Review when deliveries, material requests, gate calls, and subcontractor coordination happened over configured jobsite channels.
.png)
REVIEW-READY EXPORTS
Generate timelines of configured safety announcements, briefings, and incident-related radio activity for internal review.

.png)

Pre-production rendering. Final enclosure, labeling, accessories, and dimensions may change before shipment.
Towerless Sentinel
Towerless Sentinel — UHF/VHF — Crane Mast Mount — From $579
- Sentinel Base Node$579
- Solar Power Kit+$208
- Mobile Operations Kit+$149
- Mobile Stand+$89
Funding Pathways.
FUNDING PATHWorkplace safety training and documentation initiatives may qualify for certain safety or workforce development funding pathways depending on applicant, scope, and program rules.
General contractor safety or documentation budgets may support tools for operational review depending on internal policy and project scope.
Business purchases may qualify for Section 179 or depreciation treatment. Confirm with a tax advisor.
Explore other sectors.
Passive monitoring of configured public, unencrypted operational frequencies only. Towerless does not transmit, interfere, control aircraft, replace ATC, replace dispatch, replace emergency services, replace licensed operators, or replace official systems. Patent pending. Final production hardware may be subject to applicable equipment authorization, certification, or regulatory review before shipment. Some capabilities shown are planned or validation-stage and may change before production release.

.png)